serving 2014-01-18 through 2014-02-02
INVITATION TO BID Separate sealed Bids for the Construction of the MIDVALLEY IMPROVEMENT DISTRICT 2014 SEWER LINE REPLACEMENT will be received by MIDVALLEY IMPROVEMENT DISTRICT at the MIDVALLEY IMPROVEMENT DISTRICT office, 160 East 7800 South, Midvale, UT 84047, until 2:00 p.m. MDST, WEDNESDAY, FEBRUARY 5, 2014, and should be clearly marked "Sealed Proposal." Bids will be publicly opened and read aloud. Remove approximately 3,800 feet of 12 to 15 inch sewer line, and replace with new 18 inch sewer line. Remove 18 existing 48" manholes and replace with 19 new 60" diameter manholes. Bore sewer line under the East Jordan Canal, approximately 90 feet. Bore needs to be completed by April 1st 2014. Reconnect all existing sewer laterals to new sewer line. Re pave roads where new pipe is installed per UDOT and city standards. A non-mandatory pre-bid meeting will be held Wednesday, January 29th, 2014 at 10:00 a.m. in the Midvalley Improvement District office. Plans and contract documents will be available on www.bidsync.com, project #1401-001, on Monday January 20th, 2014. A copy of the plans and contract documents will be available for reproduction at the office of Horrocks Engineers, 2162 W. Grove Parkway, Suite 400, Pleasant Grove, UT 84062, and also at the Midvalley Improvement district office. 933824 UPAXLP
INVITATION TO BID Separate sealed Bids for the Construction of the MIDVALLEY IMPROVEMENT DISTRICT 2014 SEWER LINE REPLACEMENT will be received by MIDVALLEY IMPROVEMENT DISTRICT at the MIDVALLEY IMPROVEMENT DISTRICT office, 160 East 7800 South, Midvale, UT 84047, until 2:00 p.m. MDST, WEDNESDAY, FEBRUARY 5, 2014, and should be clearly marked "Sealed Proposal." Bids will be publicly opened and read aloud. Remove approximately 3,800 feet of 12 to 15 inch sewer line, and replace with new 18 inch sewer line. Remove 18 existing 48" manholes and replace with 19 new 60" diameter manholes. Bore sewer line under the East Jordan Canal, approximately 90 feet. Bore needs to be completed by April 1st 2014. Reconnect all existing sewer laterals to new sewer line. Re pave roads where new pipe is installed per UDOT and city standards. A non-mandatory pre-bid meeting will be held Wednesday, January 29th, 2014 at 10:00 a.m. in the Midvalley Improvement District office. Plans and contract documents will be available on www.bidsync.com, project #1401-001, on Monday January 20th, 2014. A copy of the plans and contract documents will be available for reproduction at the office of Horrocks Engineers, 2162 W. Grove Parkway, Suite 400, Pleasant Grove, UT 84062, and also at the Midvalley Improvement district office. 933824 UPAXLP