NOTICE INVITING BIDS RECEIPT OF BIDS: Sealed bids will be received at the office of General Manager of the Central Utah Water Conservancy District, (the "OWNER" of the work), 355 West University Parkway, Orem, Utah 84058, until 11:00 AM MDT on Tuesday, August 27, 2013, for furnishing materials, labor, and performing all work for construction of the "Wasatch County Water Efficiency Project - Wasatch Canal Lining - Coyote Lane to Valley Hills Reach" for the Central Utah Water Conservancy District. The award, if made, will be within thirty (30) days after the opening of bids. DESCRIPTION OF WORK: The construction work, in general, consists of furnishing and installing the "Wasatch County Water Efficiency Project - Wasatch Canal Lining - Coyote Lane to Valley Hills Reach" consisting of lining 4,660 lineal feet of existing canal with cast-in-place, 4,000-psi concrete. The lining will require excavation in the canal and has a finished width of 10 feet, 3.5 feet deep, with 8-inch thick reinforced walls and floor. Two concrete-lined ingress/egress ramps will be constructed, existing canal structures will be modified and new concrete lining connected to them, two existing turnout structures will be removed and installed in the walls of the new concrete lining, the access along the canal will be improved by removing trees and other vegetation, and an access will be constructed along the downhill side of the canal. SITE OF WORK: The work is located in Wasatch County, Utah, and begins just north of the Wasatch Canal and Coyote Lane bridge structure (near an existing pump station). The work ends at the existing concrete canal lining in the Valley Hills Subdivision near the existing Creamery Ditch Overflow structure. COMPLETION OF WORK: Work under this contract will begin on or before the tenth day after receiving written Notice to Proceed from the Owner. The work must be fully completed by Friday, April 11, 2014. OPENING OF BIDS: The bids will be publicly opened and read aloud at 11:00 AM on Tuesday, August 27, 2012. Any bid received from a bidder who is not qualified or received after the closing time for receipt of bids will be returned unopened. OBTAINING CONTRACT DOCUMENTS: The Contract Documents are entitled "WASATCH COUNTY WATER EFFICIENCY PROJECT -WASATCH CANAL LINING - COYOTE LANE TO VALLEY HILLS REACH." The Contract Documents will be available Tuesday, August 12, 2013, and may be examined at the following locations: Office of the Project Manager Intermountain Contractor Central Utah water Conservancy District www.intermountain.construction.com 355 West University Parkway Orem, Utah 84058-7303 Mountainlands Area Plan Room 583 W. 3560 S. Suite 4 Salt Lake City, UT 84115 Mountainlands Area Plan Room 1116 S. State Street Orem, UT 84097 Those interested in purchasing individual sets of Contract Documents may obtain all Contract Documents from the Construction Manager at the above address. The non-refundable cost for all Volumes of the Contract Documents is $50.00. BID SECURITY: Each Bid shall be accompanied by a certified check, cashier's check, or a bid bond (acceptable to the Owner), in the amount equal to at least ten percent (10%) of the lump sum bid amount, payable without condition to the Owner as a guarantee that the bidder, if awarded the Contract, will promptly execute such Contract in accordance with the Bid and in manner and form required by the Contract Documents, and will furnish good and sufficient bond for the faithful performance of the same. The bid securities of the three (3) lowest bidders will be retained until the Contract is signed and satisfactory bonds furnished, or other disposition made thereof. The bid securities of all bidders, except the three (3) lowest, will be promptly returned after the canvass of bids. BIDS TO REMAIN OPEN: The Bidder shall guarantee the Total Bid Price for a period of thirty (30) calendar days from the date of bid opening. PRE-BID SITE VISIT and PRE-BID CONFERENCE: A mandatory pre-bid site visit and conference will be held on Tuesday, August 20, 2013 to field review the proposed construction area, which will include a question and answer period. This mandatory pre-bid conference will start at 1:00 pm at the Wasatch County Water Efficiency Field office at 626 East 1200 South, Heber City, Utah. The purpose of this meeting will be to clarify the intent of the Plans and Specifications and to answer any questions bidders and/or suppliers may have on the project. Only those bidders who have attended the pre-bid conference will be allowed to submit bids. PROJECT ADMINISTRATION: All communication related to the WORK shall be directed to the Project Manager prior to opening of Bid. Kirk D. Beecher, P.E., Project Manager Central Utah Water Conservancy District 355 West University Parkway Orem, Utah 84058-7303 Phone: 801-226-7193 FAX: 801-226-7150 Email: kirk@cuwcd.com OWNER'S RIGHT RESERVED: The Central Utah Water Conservancy District reserves the right to reject any or all bids, to waive any formality or technicality in a bid, and to make award to the lowest responsive, responsible bidder if deemed in the best interests of the Owner, or the public good; or as being non-responsive to the requirements set forth herein (Information for Bidders info.), or on the grounds that a prospective Contractor is not qualified. TENTATIVE PROJECT SCHEDULE: The following is a preliminary schedule and is subject to change: Bid Documents Available: Tuesday, August 12, 2013 Mandatory Pre-bid Conference & Site Visit: 1:00 pm, Tuesday, August 20, 2013 Bid Opening: 11:00 am, Tuesday, August 27, 2013 Board of Trustees Approve Award: Wednesday, August 28, 2013 Preconstruction Meeting: Monday, October 7, 2013 Notice to Proceed: Friday, October 11, 2013 Tentative Start Field Construction: Monday, October 14, 2013 Construction Complete: Friday, April 11, 2014 Central Utah Water Conservancy District By: Don A. Christiansen General Manager Published: August 11, 2013 898738 UPAXLP
NOTICE INVITING BIDS RECEIPT OF BIDS: Sealed bids will be received at the office of General Manager of the Central Utah Water Conservancy District, (the "OWNER" of the work), 355 West University Parkway, Orem, Utah 84058, until 11:00 AM MDT on Tuesday, August 27, 2013, for furnishing materials, labor, and performing all work for construction of the "Wasatch County Water Efficiency Project - Wasatch Canal Lining - Coyote Lane to Valley Hills Reach" for the Central Utah Water Conservancy District. The award, if made, will be within thirty (30) days after the opening of bids. DESCRIPTION OF WORK: The construction work, in general, consists of furnishing and installing the "Wasatch County Water Efficiency Project - Wasatch Canal Lining - Coyote Lane to Valley Hills Reach" consisting of lining 4,660 lineal feet of existing canal with cast-in-place, 4,000-psi concrete. The lining will require excavation in the canal and has a finished width of 10 feet, 3.5 feet deep, with 8-inch thick reinforced walls and floor. Two concrete-lined ingress/egress ramps will be constructed, existing canal structures will be modified and new concrete lining connected to them, two existing turnout structures will be removed and installed in the walls of the new concrete lining, the access along the canal will be improved by removing trees and other vegetation, and an access will be constructed along the downhill side of the canal. SITE OF WORK: The work is located in Wasatch County, Utah, and begins just north of the Wasatch Canal and Coyote Lane bridge structure (near an existing pump station). The work ends at the existing concrete canal lining in the Valley Hills Subdivision near the existing Creamery Ditch Overflow structure. COMPLETION OF WORK: Work under this contract will begin on or before the tenth day after receiving written Notice to Proceed from the Owner. The work must be fully completed by Friday, April 11, 2014. OPENING OF BIDS: The bids will be publicly opened and read aloud at 11:00 AM on Tuesday, August 27, 2012. Any bid received from a bidder who is not qualified or received after the closing time for receipt of bids will be returned unopened. OBTAINING CONTRACT DOCUMENTS: The Contract Documents are entitled "WASATCH COUNTY WATER EFFICIENCY PROJECT -WASATCH CANAL LINING - COYOTE LANE TO VALLEY HILLS REACH." The Contract Documents will be available Tuesday, August 12, 2013, and may be examined at the following locations: Office of the Project Manager Intermountain Contractor Central Utah water Conservancy District www.intermountain.construction.com 355 West University Parkway Orem, Utah 84058-7303 Mountainlands Area Plan Room 583 W. 3560 S. Suite 4 Salt Lake City, UT 84115 Mountainlands Area Plan Room 1116 S. State Street Orem, UT 84097 Those interested in purchasing individual sets of Contract Documents may obtain all Contract Documents from the Construction Manager at the above address. The non-refundable cost for all Volumes of the Contract Documents is $50.00. BID SECURITY: Each Bid shall be accompanied by a certified check, cashier's check, or a bid bond (acceptable to the Owner), in the amount equal to at least ten percent (10%) of the lump sum bid amount, payable without condition to the Owner as a guarantee that the bidder, if awarded the Contract, will promptly execute such Contract in accordance with the Bid and in manner and form required by the Contract Documents, and will furnish good and sufficient bond for the faithful performance of the same. The bid securities of the three (3) lowest bidders will be retained until the Contract is signed and satisfactory bonds furnished, or other disposition made thereof. The bid securities of all bidders, except the three (3) lowest, will be promptly returned after the canvass of bids. BIDS TO REMAIN OPEN: The Bidder shall guarantee the Total Bid Price for a period of thirty (30) calendar days from the date of bid opening. PRE-BID SITE VISIT and PRE-BID CONFERENCE: A mandatory pre-bid site visit and conference will be held on Tuesday, August 20, 2013 to field review the proposed construction area, which will include a question and answer period. This mandatory pre-bid conference will start at 1:00 pm at the Wasatch County Water Efficiency Field office at 626 East 1200 South, Heber City, Utah. The purpose of this meeting will be to clarify the intent of the Plans and Specifications and to answer any questions bidders and/or suppliers may have on the project. Only those bidders who have attended the pre-bid conference will be allowed to submit bids. PROJECT ADMINISTRATION: All communication related to the WORK shall be directed to the Project Manager prior to opening of Bid. Kirk D. Beecher, P.E., Project Manager Central Utah Water Conservancy District 355 West University Parkway Orem, Utah 84058-7303 Phone: 801-226-7193 FAX: 801-226-7150 Email: kirk@cuwcd.com OWNER'S RIGHT RESERVED: The Central Utah Water Conservancy District reserves the right to reject any or all bids, to waive any formality or technicality in a bid, and to make award to the lowest responsive, responsible bidder if deemed in the best interests of the Owner, or the public good; or as being non-responsive to the requirements set forth herein (Information for Bidders info.), or on the grounds that a prospective Contractor is not qualified. TENTATIVE PROJECT SCHEDULE: The following is a preliminary schedule and is subject to change: Bid Documents Available: Tuesday, August 12, 2013 Mandatory Pre-bid Conference & Site Visit: 1:00 pm, Tuesday, August 20, 2013 Bid Opening: 11:00 am, Tuesday, August 27, 2013 Board of Trustees Approve Award: Wednesday, August 28, 2013 Preconstruction Meeting: Monday, October 7, 2013 Notice to Proceed: Friday, October 11, 2013 Tentative Start Field Construction: Monday, October 14, 2013 Construction Complete: Friday, April 11, 2014 Central Utah Water Conservancy District By: Don A. Christiansen General Manager Published: August 11, 2013 898738 UPAXLP